    Phase 1: Planning & Design (Before Breaking Ground)

    Pre-construction steps that set your project up for success. Each one builds on the last.

    SIP panels speed up construction and improve quality. Here's the roadmap from planning to a weatherproof shell. A local builder you hire completes the assembly phase in 3 to 5 days once your site, panels and builder are in place. Your builder buys the panels directly from EPS at the price DreamStart quotes.

    Best Houses covered how SIP barndominium shells are changing rural Missouri housing.

    Source: Best Houses: SIP Barndominiums Revolutionizing Rural Missouri Housing

    1

    Define Vision & Scope

    Determine size, style, purpose, and must-have features for your Homestead Shell.

    Deliverables: Project Brief, Feature List

    2

    Land Acquisition & Site Prep

    Secure property, conduct soil tests, and complete surveys.

    Deliverables: Land Deed, Survey Reports, Soil Test Results

    3

    Financial Planning & Pre-Approval

    Get construction loan pre-approval and establish your budget. Simultaneously research local zoning codes while securing financing.

    Deliverables: Detailed Budget, Financing Pre-Approval, Max Loan Amount

    4

    Design & Blueprints

    Work with architect/engineer to create final construction plans engineered for SIP panels. Builder creates final quote while designer finalizes engineering.

    Deliverables: Final Blueprints, 3D Renderings, Engineered SIP Panel Layout, Detailed Cost Estimate

    5

    Permitting & Final Approval

    Submit plans to local authorities, finalize loan, and obtain Notice to Proceed (NTP). Use county permit review time for final contract negotiations.

    Deliverables: Issued Building Permit, Loan Closing, NTP & Draw Schedule

    Timeline: 2 to 6 weeks (varies by county permit review time)

    Phases 2 to 4: SIP Construction (Site to Shell)

    Why SIP panels change everything: about 45 to 55% less framing time than stick framing (RS Means).

    Site & Slab Prep

    2 to 4 weeks

    Panel Delivery

    1 day

    SIP Installation

    3 to 5 days

    Weatherproof Shell

    Complete!

    Why SIP Panels Change Everything

    About 45 to 55% less framing time (RS Means)
    Pre-cut openings for windows/doors
    Walls: R-26+ insulation (6.5" thick)
    Roof: R-40+ insulation
    No thermal bridging, with continuous insulation
    Numbered panels for efficient installation
    6

    Site Clearing & Access

    Clear site, establish temporary utilities, and create access roads.

    Temporary Utilities Established
    7

    Excavation & Grading

    Excavate and grade for proper drainage and a level building pad.

    Level Building Pad
    8

    Slab Pour (Your Contractor)

    DreamStart provides your concrete contractor with a complete engineered slab spec package (anchor bolt layout, thickness, and load ratings) so the slab is built exactly right for your SIP panels.

    Engineered Slab Specs Provided to Your Contractor
    9

    Sub-Slab Utilities

    Install underground plumbing and electrical conduit before slab pour.

    Stub-out Utilities Ready for Connection
    10

    Sill Plates & Layout

    Install treated sill plates on the cured slab and snap the panel layout lines.

    Slab Ready for Wall Panels
    11

    Wall Panel Installation

    Crane lifts and sets SIP wall panels. Panels are raised, braced, and connected with structural splines.

    Wall Sheathing Installed (OSB both sides)

    Completing Your Shell & Interior

    From roof installation to dried-in handoff. After that, the interior is yours.

    12

    Roof Panel/Truss Installation

    Solid-Core SIP roof panels or engineered trusses are set; SIP roofs provide R-40+ insulation. Roof deck complete in 1 to 2 days.

    13

    Exterior Metal Cladding

    Standing seam or screw-down metal exterior installed. The shell is now wind and watertight from the outside.

    14

    Windows & Exterior Doors Set

    All windows and exterior doors are installed. The shell is now fully dried in and protected from weather inside and out.

    15

    Shell Handoff: You Take It From Here

    Your local builder completes a fully dried-in, weathertight Homestead Shell. You then hire your own interior trade contractors or DIY at your own pace.

    Once the Homestead Shell is dried in, interior work can proceed at any pace. The weathertight shell protects your investment while finishing work is completed on your timeline.

    Process Questions

    How long does the entire process take?

    From your first Planning Call to a dried-in Homestead Shell is typically 4 to 9 months, depending on permitting and land prep. Once your site, panels and builder are in place, a local builder you hire (who separately quotes and performs the assembly) can raise the SIP shell in 3 to 5 days. DreamStart does not self-perform assembly.

    Do I need to hire my own slab contractor?

    Yes. You arrange your own concrete contractor. DreamStart provides a complete engineered slab spec package (anchor bolt layout, thickness, load ratings) so your contractor gets it right the first time.

    Does DreamStart do interior finishing?

    No. DreamStart is a home designer: we handle design, slab specs, EPS panel pricing documentation, and handoff materials. Assembly labor is separately contracted and quoted by a local builder you hire. Your builder buys the panels directly from EPS at the price DreamStart quotes. For interior finish work, you hire your own licensed electricians, plumbers, and finish carpenters (or a local builder of your choosing).

    What states does DreamStart serve?

    DreamStart is headquartered in St. Joseph, Missouri. We design for land in Missouri and nearby states; panels ship from Iowa. That includes Kansas, Iowa, Nebraska, Illinois, Arkansas, Oklahoma, Tennessee, and Kentucky.