Money
Funding and Financial Clearance
Before spending a dime on design, knowing the "all-in" number is essential. Construction loans differ from standard mortgages and require a detailed cost-to-build breakdown.
Self-Funded
Have cash or funds set aside for the project. Skip the loan process and move directly to drawings.
Construction Loan
Get pre-approved for a construction loan. Recommended lender with homestead shell experience:
Chris Miller
First Federal Bank of Kansas CityBudget Considerations
Soft Costs
Soil tests, surveys, impact fees, architectural fees
Contingency Fund
10 to 15% buffer for unexpected site issues
All-In Number
Total project cost including finishes and site work
Drawings
Architectural and Structural Design
You can't get a price or a permit without a final set of drawings. For SIP construction, the drawings must be precise, because factory-cut panels are built to the inch from these plans.
$9,750 design package, including a Walk Your Plans visit to walk your full-size floor plan and make final changes. DreamStart coordinates with our design partners and matches you with the right designer based on your project, location, and timeline. The plans are yours to keep, even if you build elsewhere.
DreamStart coordinates with our design partners to match you with the right designer for your project. You will be contacted within 1 business day to begin the drawing process.
Three Ways to Handle Drawings
Full Custom Package
Start with your land and wishlist. DreamStart's design partners produce a complete set from scratch: floor plan, elevations, electrical, plumbing, site plan, and documentation for your county building department.
Pre-Designed Floor Plan
Choose from DreamStart's catalog of proven layouts: 1,500+ sq ft, all on one level, with or without a shop. Plans are then adapted to your specific site, county codes, and panel layout.
Client-Supplied Drawings
Already working with an architect or have existing plans? DreamStart reviews them for SIP panel compatibility and coordinates factory cut files directly from your drawings.
Not sure which path fits? Book a free 30-minute Planning Call and we'll talk through your situation.
Steps 3 & 4: Approval & Build
The final gate and the physical launch: from permit approval to a dried-in Homestead Shell.
Approval
The Permitting Paperwork
This is the go/no-go gate controlled by the local building department. Engineered drawings must meet local building codes for wind load, snow load, and other requirements. SIP panels frequently exceed code minimums, which works in your favor.
Permit Submission
Engineered drawings are submitted to the county or city to confirm local building code compliance.
Zoning & Easements
Confirm the homestead vision doesn't conflict with local zoning restrictions or utility easements.
HOA / Arch. Review
If your land is in a developed area, the local architectural review board may need to approve the design.
Note: Permit timelines vary widely. Some rural Missouri counties approve in days; others take weeks. Many rural counties have no county-level building codes at all. Your drawings include all documentation typically required by local jurisdictions.
Slab + Homestead Shell
The Physical Launch
This is the transition from paper to project. Once permits are in hand, Homestead Shell construction begins.
The Slab
Foundation
Once permits are in hand, your concrete crew pours the foundation. This is the most critical step: the shell's integrity depends on the slab being perfectly level and square.
The Homestead Shell
Dry-In
Factory-cut SIP panels are delivered and the local builder erects the Homestead Shell. Windows and doors are bought separately; your builder installs them. Then the structure is dried-in and protected from the elements.
Once the Homestead Shell is dried in, interior work can proceed at any pace. The weathertight shell protects the investment while finishing work (contracted separately with your chosen trades) is completed on your timeline.