Land
You own it or have it under contract
I own the land or have a purchase contract with closing date confirmed
I have a current survey, or I know the parcel boundaries and legal description
I've confirmed the land is zoned (or unzoned) to allow residential construction
Access to the parcel is established (road or easement on record)
I've done a rough site walk and identified where the house footprint will sit
Topography, drainage direction, and setbacks from property lines
I have (or have budgeted for) a soil bearing test if the site has clay, rock, or fill
Missouri clay and Ozark rock frequently add $5K to $20K to foundation cost
Financing
Budget confirmed: cash or construction loan
I know my all-in budget number: not just shell cost, but mechanicals, finishes, and site work
If financing: I have a pre-approval letter from a lender who has closed barndominium construction loans
A construction lender such as First Federal Bank of Kansas City is the right call, not conventional mortgage brokers
I've built a 10 to 15% contingency on top of my estimated total
I understand draw schedules: construction loans disburse in phases, not as a lump sum
I've accounted for soft costs: soil test, survey, architectural fees, permit fees, impact fees
County Requirements
Know your permit tier before you design
I know whether my county has adopted the IRC (International Residential Code) or is a no-code county
This determines whether engineered stamped drawings are required
I've confirmed the county's setback requirements (how far the structure must sit from property lines and road right-of-way)
I know whether my county requires a septic permit before a building permit is issued
I've checked HOA or subdivision restrictions; some rural tracts have deed restrictions that limit metal exteriors
I know the local building department's current turnaround time for permit review
Utilities
Know your utility plan before you design the slab
I know where electric service will come from: existing pole, new rural co-op run, or solar + battery
Water source is identified: public municipal, well (depth estimate from neighbor wells), or cistern
Septic design is started or approved, with a perc test done or on the schedule
Septic design often takes 4 to 8 weeks and must precede the building permit in most counties
I know approximately where the utility stub-outs will enter the foundation (affects slab design)
Propane vs. natural gas decision is made; this affects mechanical rough-in and appliance spec
Timeline
Realistic expectations set before you start
I understand the full sequence: drawings (8 to 14 weeks) → permit (2 to 8 weeks) → slab cure (21 to 28 days) → shell install (3 to 5 days on-site) → interior build-out (3 to 8 months)
I have a target move-in window and understand it may shift by 30 to 60 days in either direction
I've planned for where I'm living during construction. If I'm selling my current home, timing matters
I know shell lead time after ordering is typically 8 to 14 weeks from the factory
Your Role as Owner-Builder GC
Understand what you're taking on
I understand that the local builder I hire delivers the weathertight shell; mechanicals, insulation finishing, and interior are owner-managed or separately contracted
I've identified at minimum a licensed electrician and plumber who will pull their own permits
In Missouri, owners can pull their own structural permit in some counties, but not electrical or plumbing
I have a realistic estimate for interior labor (finish crew, cabinets, flooring, drywall)
I know who will manage the foundation and slab work. DreamStart connects you, but you select the contractor
I've thought through my personal bandwidth: owner-building takes 5 to 15 hours a week of active management
Shell Order Readiness
What DreamStart needs before your order goes to the factory
Permit-ready drawings are complete and county-submitted (or county-waived for no-code areas)
Foundation/slab dimensions are confirmed; panel cut files are built to the inch from these plans
Window and door schedule is finalized; openings are factory-cut, not field-modified
Roof pitch, wall height, and roofline design are locked; these drive panel count and kit price
Foundation contractor is on schedule; shell install can't begin until the slab is cured and certified
$9,750 design package, including a Walk Your Plans visit to walk your full-size floor plan and make final changes, is confirmed. This kicks off the drawing phase